Faunal survey of Ahmedabad Metro Rail Project, Phase II

Evento de amostragem
Versão mais recente published by Test Organization #1 on jan 6, 2024 Test Organization #1
Publication date:
6 de janeiro de 2024
Published by:
Test Organization #1
Licença:
CC-BY 4.0

Baixe a última versão do recurso de dados, como um Darwin Core Archive (DwC-A) ou recurso de metadados, como EML ou RTF:

Dados como um arquivo DwC-A download 110 registros em English (20 KB) - Frequência de atualização: desconhecido
Metadados como um arquivo EML download em English (13 KB)
Metadados como um arquivo RTF download em English (10 KB)

Descrição

Ahmedabad Metro Rail project, Phase II passes through Ahmedabad & Gandhinagar city, with two corridors as ; 1. Motera Stadium to Mahatma Mandir (22.814 km with 20 stations) 2. GNLU to GIFT City (4.982 km with 2 stations)

Registros de Dados

Os dados deste recurso de evento de amostragem foram publicados como um Darwin Core Archive (DwC-A), que é o formato padronizado para compartilhamento de dados de biodiversidade como um conjunto de uma ou mais tabelas de dados. A tabela de dados do núcleo contém 110 registros.

Também existem 1 tabelas de dados de extensão. Um registro de extensão fornece informações adicionais sobre um registro do núcleo. O número de registros em cada tabela de dados de extensão é ilustrado abaixo.

Event (core)
110
Occurrence 
803

This IPT archives the data and thus serves as the data repository. The data and resource metadata are available for download in the downloads section. The versions table lists other versions of the resource that have been made publicly available and allows tracking changes made to the resource over time.

Versões

A tabela abaixo mostra apenas versões de recursos que são publicamente acessíveis.

Como citar

Pesquisadores deveriam citar esta obra da seguinte maneira:

Sugoor R K (2024). Faunal survey of Ahmedabad Metro Rail Project, Phase II. Version 1.4. Test Organization #1. Samplingevent dataset. https://ipt.gbif.org/resource?r=gmrc-draft&v=1.4

Direitos

Pesquisadores devem respeitar a seguinte declaração de direitos:

O editor e o detentor dos direitos deste trabalho é Test Organization #1. This work is licensed under a Creative Commons Attribution (CC-BY 4.0) License.

GBIF Registration

Este recurso foi registrado no GBIF e atribuído ao seguinte GBIF UUID: 7117c69f-cc50-4c24-9b75-db20f63265cf.  Test Organization #1 publica este recurso, e está registrado no GBIF como um publicador de dados aprovado por GBIF Secretariat.

Palavras-chave

Samplingevent; Metrorail; fauna; Ahmedabad; Gandhinagar; Aves; Mammals; Reptiles

Contatos

R K Sugoor
  • Originador
  • Ponto De Contato
Director
GEER Foundation, Gandhinagar
Near CH0 circle Indroda Park, PO Sector 7,
382007 Gandhinagar
Gujarat
IN
23977300
S S Rathore
  • Originador
Managing Director
Gujarat Metro Rail Corporation Ltd.
Block No.1, First Floor, Karmayogi Bhavan, Sector 10/A, Gandhinagar-382010
382010 Gandhinagar
GUJARAT
IN
+91-79-23248572

Cobertura Geográfica

Gandhinagar, Gujarat's new capital city, lies on the west bank of the Sabarmati River. The river bifurcates the Ahmedabad city into eastern and western parts. Average Elevation of Gandhinagar is 81 m above msl, and Ahmedabad is 53 m; however, elevation of the proposed corridors varies from 60m to 79m

Coordenadas delimitadoras Sul Oeste [23,095, 72,381], Norte Leste [72,642, 72,941]

Cobertura Taxonômica

The species abundance along Ahmedabad Metro-rail phase-II alignment came out to be 4326 and the species richness of the area came out to be 100 species (all taxa collectively). It implies a total of 100 species of birds, mammals and herpetofauna have been recorded collectively. It includes 81 species of Birds belonging to 43 families, 6 species of mammals belonging to 5 families, and 13 Species of herpetofauna belonging to 7 families have been recorded from the Ahmedabad-Gandhinagar metro-rail alignment.

Reino Animalia (Animals)

Cobertura Temporal

Data Inicial / Data final 2023-09-13 / 2023-09-15

Dados Sobre o Projeto

Ahmedabad Metro Rail project, Phase II passes through Ahmedabad & Gandhinaagr city, with two corridors as ; 1. Motera Stadium to Mahatma Mandir (22.814 km with 20 stations) 2. GNLU to GIFT City (4.982 km with 2 stations)

Título Study of Biodiversity of Ahmedabad Metro Rail project Phase II, Surat Metro Rail project Phase I and its Data Sharing on GBIF Platform
Identificador Ministry of Housing & Urban Affairs , Government of India
Financiamento Loan from bilateral agencies (AFD & KFW) : 55.28% % Government of India & Government of Gujarat(GoI & GoG ): 44.72 %
Descrição da Área de Estudo Gandhinagar, Gujarat's capital city, lies on the west bank of the Sabarmati River. The river punctuates the Ahmedabad city into eastern and western parts. Average Elevation of Gandhinagar is 81 m above msl, and Ahmedabad is 53 m; however, elevation of the proposed corridors varies from 60m to 79m. Geologically, Gandhinagar falls in Alluvium & Blown Sand, of recent age; whereas Ahmedabad city falls in the lithology of Alluvium, Blown Sand, & Miliolite Sand of recent age. Goradu and Kyari soils are generally found in Ahmedabad City. The soils in the Gandhinagar district are generally sandy loam type with grey to brown colour. The proposed Project falls in Seismic Zone III as per revised seismic zoning map of India. Ahmedabad and Gandhinagar districts form a part of the Cambay basin and are occupied by quaternary alluvium comprising mainly of sand, gravel, silt, clay and Kankar etc

Métodos de Amostragem

With the assistance of the RS-GIS unit of the GEER Foundation, all habitat diversity was located, and a detailed inventory of each habitat was completed. Various animal species were recorded by using the line transect method.

Área de Estudo Using a stratified sample approach, the inventory was completed, covering the diversity of habitats on both sides of the Metro Rail track. A 250-meter transect was planned out on both sides of the Metro Rail Project to encompass all adjacent habitats, including wetlands, agricultural lands, woods, grasslands, and wastelands. All habitat variety was discovered with the assistance of the GEER Foundation's RS-GIS team.

Descrição dos passos do método:

  1. The inventory was carried out through stratified sampling manner that was cover all habitat diversity found on both sides of the Metro Rail track. On both sides of the Metro Rail Project, a transect with a length of 250m laid in such way that was cover all habitats such as wetlands, agricultural lands, forests, grasslands, wastelands etc. nearby the project area. All habitat diversity had find out with the help of RS-GIS unit of GEER Foundation and an inventory of each habitat was carried out thoroughly.

Metadados Adicionais

Identificadores alternativos https://ipt.gbif.org/resource?r=gmrc-draft